Case Study #4: S.T. Olin Lab

Scope of Work
· Recommissioned the existing mechanical and control systems to optimize overall system performance.
-
Installed PIR occupancy sensors to reduce excessive air change rates and enable occupied and unoccupied modes of operation.
-
Rebuilt the existing air handling humidification units to improve system efficiency while minimizing energy use.
-
Installed fume hood closed mode to reduce ventilation rates when rooms are unoccupied with fume hoods closed.
-
Installed VSDs on the laboratory building exhaust fans to provide better static pressure control.
Project Completed
-
August 2004
Project Cost
-
$790,000
Energy Savings
-
$230,000
Simple Payback
-
4.9 years
Scope of Work
· Recommissioned the existing mechanical and control systems to optimize overall system performance.
-
Installed PIR occupancy sensors to reduce excessive air change rates and enable occupied and unoccupied modes of operation.
-
Rebuilt the existing air handling humidification units to improve system efficiency while minimizing energy use.
-
Installed fume hood closed mode to reduce ventilation rates when rooms are unoccupied with fume hoods closed.
-
Installed VSDs on the laboratory building exhaust fans to provide better static pressure control.
Project Completed
-
August 2004
Project Cost
-
$790,000
Energy Savings
-
$230,000
Simple Payback
-
4.9 years
Scope of Work
· Recommissioned the existing mechanical and control systems to optimize overall system performance.
· Installed PIR occupancy sensors in the lab spaces to enable occupied and unoccupied modes of operation.
· Installed VSDs on the existing glycol reheat system circulation pumps to reduce pump motor energy us at partial loads.
Project Completed
-
November 2004
Project Cost
-
$252,000
Energy Savings
-
$208,000
Simple Payback
-
1.2 years