Case Study #3: Baker Lab
Scope of Work
· Recommissioned the existing mechanical and control systems to optimize overall system performance.
· Installed PIR occupancy sensors in the lab spaces to enable occupied and unoccupied modes of operation.
- Installed sash extensions on 60 teaching lab fume hoods to reduce excessive face air velocities and improve capture efficiency.
Project Completed
- August 2004
Project Cost
- $304,000
Energy Savings
- $144,000
Simple Payback
- 2.1 years